Dear Yoriz,
thanks for your attempt.
A few things I would like to specify:
1- you are right when you say that I am happy with the code up to when I plot it.
2- you don't need astral in order to help me solve this issue, as I didn't include the sunrise time
in my graph yet.
3-I would like to enhance that the main issue that I have with the plot right now, is being able to slim the width of the bars without losing the date format on the graph, meanwhile, showing all the hours marked with small vertical lines. The link I included before will show you the graph that I am trying to obtain.
Let me please know if there is anything else that I should provide.
for the values of y, I am currently trying these three:
700 760 980
and for x, these 3 dates:
2015-01-25, 2015-01-26, 2015-01-27
thanks for your attempt.
A few things I would like to specify:
1- you are right when you say that I am happy with the code up to when I plot it.
2- you don't need astral in order to help me solve this issue, as I didn't include the sunrise time
in my graph yet.
3-I would like to enhance that the main issue that I have with the plot right now, is being able to slim the width of the bars without losing the date format on the graph, meanwhile, showing all the hours marked with small vertical lines. The link I included before will show you the graph that I am trying to obtain.
Let me please know if there is anything else that I should provide.
for the values of y, I am currently trying these three:
700 760 980
and for x, these 3 dates:
2015-01-25, 2015-01-26, 2015-01-27